Forever - Valentino," Exhibition is a gorgeous garments theatrical presentation, the most comprehensive exhibition to date paying homage to the founder Valentino Garavani and they are opened Event at M7, the design and innovation hub in Msheireb Downtown Doha. Evolution Live Events Management was hired by Valentinos teams to prepare a technical design and build the scenic display for Forever Valentino’s M7 Exhibition in Qatar, More then 15 Trucks of the material cross the borders to build there stuffs Taking the reference of the actual colosseum, Evolution was tasked to build the design using materials that complimented the shape and curvature of the design without compromising the seamless finish of the feature and Its Built a very humongous distinctive style so we are using the expertise in materials such as metal, wooden frame and its covered with molten-nut fabric for the presentation of designer, Finally Evolution achieved the desired results. Gasometer was the main challenging structure of this project because its fully made with steel tubes so Our evolution engineering deeply split the structure plan and change some fixing methodology and designing consisted preparing working Showcase Constructed a 6-ton technical structure that was meticulously thought out and had excellent workmanship for the showcasing of designer clothes at the Forever Valentino exhibition. Utilizing the actual shelves as a model, it was necessary to construct the design using materials that enhanced the design's shape and curvature without diminishing the feature's seamless finish. Evolution accomplished the intended outcomes by using its knowledge in materials including wood, metal, and fabrics. For the Standardized presentation of designer labels in the Forever Valentino exhibition. A classic-style white wood table and Steel shelves with an elegant powder-coated finish was utilized for displaying apparel. Scenic art 3D Mitoraj statues in fiber tissue material and its pleased on the MDF Scenic Art Plinth, The Status ceiling constructed in metal and Polycarbonate sheet because of its hanging from the truss, Inside of the lighting box have DC 24V Multicolor 3k to 6.2k LED Strips Strick on the twin base and it control color with remotely, In the printed backlit fabric material wrapped with hole structure, finally making it appear like a natural sky. Signages was construct of multicolored acrylic panels, which make the ideal backdrop for the bespoke murals that can be found inside the exhibit spaces' walls. And with the aid of a steel wire rope, it is hanged from the truss. LIST OF OTHER DISPLAY * CHASIER SHOWCASE PLINTH, * GLASS DISPLAY TABLE, * ARCHAVE SHOWCASE PLINTH, * FABRIC WARRPED PIN BOAD, * FABRIC WARRPED DISPLAY TABLE, * SHOWCASE STEEL SHELVES, * TV DISPLAYT STAND AND LIFT ROOM PLINTH References Images:We were privileged to be a part of Riyadh Season opening this year which led us to work with one of the biggest Circus companies in the World, Cirque Du Soleil and Matane Productions. Our part was to deliver a boat that’s been converted from a Buggy. All the control mechanism had to be rethought from scratch as the prop boat needed to act and feel like a boat. Steering wheel needed to be converted into a helm and the brake needed to be a part of the helm, which posed another challenge. First we started with dismantling a brand new buggy carefully, while keeping all the electronics intact as we used it later. Once that was done, all that remained was the chassis with the motor and wheels. Another auxiliary chassis was designed from scratch and placed on top of it which acted as the base for the placements of all the plastic hollow sheets. Once the auxiliary frame was bolted, it was time to place back all the other electronics. This is when we realized that the space we kept for the batteries were not enough and we forgot to make any additional space to keep all the electronics that drives the motor. After few hours of changing things here and there, we were able to fit everything in it. A motorcycle’s handle was used to act as an accelerator, which was placed at the tip of the helm. A 2 meter long metal wire was used to act as the conduit for the accelerator. Original accelerator was retrofitted to work with the handle. An extension arm was made and attached to the accelerator which pivoted from it’s place when the handle was twisted, resulting in acceleration. As for the brake, the brake wires were re-routed towards the helm too so pulling up the helm resulted in braking the buggy. Two lengthy wires were bolted near each front wheel, which in turn connected to the helm, twisting the helm sideways made the wheels turn. Biggest issue that we faced was during it’s delivery to KSA, the boat ended up getting damaged from multiple places during transportation from Dubai to Riyadh. Battery tray broke down, which caused them to hang and the accelerator wire broke off from the pivot point. Luckily we had our Welder and Automation Engineer on site, and with their help we were able to fix up the boat.
Although there were multiple issues during the lifespan of this project, we had faith in our team to execute and delivery on time. With all the talented people at Evolution, we believe that we can do the impossible. |