Evolution Scenic
  • Home
  • Scenic Services
    • CAD Design
    • Carpentry
    • Metalwork
    • 3D Production
    • Paint Shop
    • Textile Services
    • Print
  • Our Work
    • Terhal by Dragone
    • Prada Mode
    • Ideas Festival
    • ADIDAS Sole DXB
    • Forever Valentino
    • Warner Brother Theme Park
    • UAE 50th NAT DAY
    • Valorant
    • EXPO Opening
    • EXPO Closing
  • What Else We Do...
    • Evolution Site Services
    • Evolution Technical
    • Evolution Furniture
    • Evolution Prop Shop
    • Evolution Film + Digital
    • Evolution Comms
    • Evolution Events
    • Evolution Services

Electro-MECHANICAL Flower installation in Via Riyadh Mall

2/1/2023

 
Picture
​Back in February 2022, we at Evolution were approached by Prolab Digital, a branding production company, to construct a large-automated flower, planned to be placed inside a mall situated in Riyadh, Kingdom of Saudi Arabia. This enormous metal flower had to open its petals to expose a mannequin within, before closing them again.

The design of the concept was first completed within 2 weeks, after which the team went ahead and started bringing the project to life within 2 months. The flower's fundamental mechanism was designed in such a manner that the petals remained in equilibrium by employing dummy weights. The mechanism was actuated by a Linak DK-6430, a medical grade actuator capable of delivering 1200N force. This actuator was linked to the petals by a few links, allowing it to readily reproduce the motion of a flower.
To serve as the brain of this device, a customized microcontroller circuit was fabricated from scratch utilizing an Atmega328p. Two limit switches were installed on the actuator's extreme ends to notify the microcontroller when to halt and reverse its motion.
Picture
The flower's operation was essentially straightforward. To start/pause and halt its motion, a wired remote with two buttons and built-in LEDs was employed. When the start button was hit, the flower would open and retain its position for roughly two and a half minutes before closing for 30 seconds. This entire process continues until the stop button is manually hit, causing the flower to collapse. Holding the start/pause button for 3 seconds brought the bloom to a standstill. This function was implemented to make it easier for artists to work and to ensure that nothing interferes with or prevents the flower from operating in the long run.

Knowing that it would be difficult to access and troubleshoot the control box after everything was in place, a mini 128x64 pixel OLED display was installed on the side of the box to display the current state of the actuator as well as other information. In addition, numerous aviation connectors with different pins were employed to connect everything. This made shipping and installation easier all while ensuring that no connections were made incorrectly.
​
There was a lot to be learnt and improved about the design once the project was live. As we enter the era of automation, Evolution takes satisfaction in creating something that will be exhibited for a particular market. We want to embrace and surpass all problems with our committed Automation & Electronic experts and all the best skills.

Scissor Lift for WB Theme Park - YAs Island

11/27/2022

 
Picture
Winter always brings in joy and happiness, along with holidays. And Holidays usually mean family times, which turn means more outing for families. This winter, Evolution had the privilege of setting up a stage for Warner Brothers Theme Park situated in Yas Island, Abu Dhabi thanks to our  client East West Events.
​
This stage needed to look like something out of a fairy tale, along with multiple magical elements. One of them being a scissor lift that was placed right at the front of the stage. This stage needed to raise up to a height of 1 meter, and the top base needs to rotate only when it’s raised up. 
Picture
Requirements like this did pose a big challenge, how would you make a lazy Susan stage that moves only when it’s raised and locks up when it’s in zero position. As the delivery date was near, our Automation Engineer had only 3 days to his disposal, where he needed to design, fabricate and deliver.
​
After 7 different iterations of the design, it was finally time to fabricate it. A scissor lift capable of lifting upto 3 tons was used as the base. A frame was built on top of it to support the top lid and to hold the cladding in place. Cladding needed to travel with the frame to hide all the internal working. Close to 50 rubberized wheels were placed on a 1.7 meter metal sheet measuring 8mm in thickness. Flange bearing was used as the center pivot point.  For the lid on top of the stage, two 18mm birch plywood were sandwiched to form the base. 
Picture
Picture
A ring of 10mm rubber was placed on an additional 3mm laser cut metal ring to act as the brake. This rubber plate was rested on top of 10 adjustable stage legs which were placed within the frame, but on its own. They place independently, so that they don’t interfere or touch the cladding, causing it to rise up.  We were able to deliver it 3 days after we started.

We faced our biggest issue once the scissor lift stage was placed on site. During transport, the base metal plate which housed all the 10 adjustable legs was moved and got damaged, to fix it we needed to bring it back to our workshop. Our Engineers replaced the base with an additional 8mm metal sheet while making sure that this time nothing moved from its position. And it worked!
​
We always take pride in being a part of something that’s larger than us. Our work bought joy and smile to those who have visited and seen the show that took place on that stage. In the end of the day, we can say proudly that our hard work got some meaning to it. 
​
Picture

warner bros. - winter carnival stage

11/27/2022

 
Evolution Live Events Management was hired by East West Events to prepare a technical design and build the scenic stage for Warner Bros. The setup was to be done at Warner Bros. theme part at Yas Island, Abu Dhabi. The installations could only be done at night under certain timelines along with following all procedures involving the Rules and Regulations as per WB's protocol.

Picture
The scenic backdrop consisted of various elements which was designed and built in accordance with the site requirements.

FIXED STRUCTURES

1. Clock Tower 
2. Main Stage 
3. Front Stage 
4. Catwalk 
5. Small circular stage at the end of Catwalk 
6. Bridge connecting the existing structure to clock tower
7. TV Frame on poles facade on sides 
8. Light Towers 
9. Staircase from Main Stage to first level of clock tower 

MECHANIZED STRUCTURES

1. Rotating Platform - 6 m Diameter
2. Lifting Platform - 2m Diameter
3. Modular Doorway to convert into a dressing room


Picture
The main structure designing consisted preparing working stage on top of an existing fountain feature which had a lot of points on top of which we could not take supports keeping in a mid a 6 meter diameter rotating platform to accommodate 5- 8 people was a center feature was situated right on top of the top fountain making this an extremely challenging and interesting project to work on. The second main feature was the clock tower which was 12 meter high and comprised front side LED tiles for video content and various artist feature for projection mapping making this structure a masterpiece that defined the overall look for the scenic backdrop. 

The clock tower structure was followed by bridge structure on the backside which was to be used by performers to access to lockers rooms on the first floor. With meticulous planning and drawings , the structures was fabricated and mocked up at Evolution warehouse to make sure they fit the existing venue.

Once the structures were taking onsite, every part of the structure was modular and was fixed into each like Lego pieces making this a one of kind installation in which everything was completed and handover in a time of 10 days giving it a rendered finish. 

Picture
The massive had many hidden features that were only installed for the artist for the ease during the show. One of the features was the room under the bridge which had curtains concealed inside that would drawn out converting this into an expandable dressing room. Another feature was the structure many store rooms for storing and access the underneath the stage for checking and repair in terms of damages to the elements used on the structure. 

The adding elements for the main scenic were the scenic TV poles which have LED tiles inside the frames on top supported on a single pipes making a artistic installation along with keeping integrity of the structure. 

Materials ranging from MDF to Multiwall sheets , Pixel controlled LEDs to high performance customized gear motors and hydraulic lifts , multiple materials were used and put together to compliment each in way which resulted in the master piece that was appreciated both the venue and performers in every way possible. 

Picture

Automating Santa'S House   -  Christmas At Expo

11/24/2022

 
Picture

Tis the season, as the say. Christmas was inching ever so close, and we had a deadline to hit. Scenic had the daunting task of building Sant’s house, with interactive elements within the house. A fireplace, Santa’s letters, a small gift station, the illustrious Christmas tree and more. Making it feel oh so warm and cosy. 

Picture
Objective: Making the ever so loving Santa’s little elves. The plan was to have them all over Santa’s house, hidden in the random spots all over the house. Some would be poking behind the Christmas tree with gifts, hiding behind Santa’s workstation popping their little heads every now and again. There was also a thought of adding one that would pop out of a present, like a Jack in the Box.

We had a few things to consider for this project, first the deadline and second how much we can deliver within the deadline. We cut a lot of our plan down to scope and decided to have the elves poking off a huge stack of gifts exclusively. Since that part of the room is in the viewable area of the guests that would enter the house, it seemed like the best idea for the situation.
​
We decided to use linear actuators to have the elves pop in and out from the stack of gifts. At the actuator’s lower most position the elves would be completely covered by the gift boxes and when the actuator slowly ascends the elves pops in view, all with different actuation lengths. 
Picture
​Before we could work on the electronics, we were told to provide the locations for the elves so that the stack of presents could be arranged around them. Caroline helped put all the elves in place on Sketchup, to get an idea of placements and prospective.

With that sorted we can now look at building the essential control panel for this project. The setup was straight forward:
  • 1*Arduino control board to program the motion in play
  • 9*Motor control to enable the linear actuator to extend/retract
  • 1*A 12V/5V power supply for the linear actuators and the Arduino

All these components we assembled inside a junction box with male barrel connectors as outputs to connect the linear actuators with the elves in place. We extended all the cables of the linear actuators on site and connected the corresponding female barrel connectors to the ends of the extended cable. Once the barrel connectors were connected the actuators are successfully connected to the motor drivers and the Arduino board.
​
Programming was simple, we generated a random sequence of actions for the elves, where at given time only one elf could pop-in and out. There was a total of 9 elves that were placed in different locations within the pile of gifts. 


Picture

WINTER CITY AT EXPO 2022

11/23/2022

 
Winter City, a festive winter wonderland that opened on November 23, 
is the latest addition to the Mobility District. It covers two avenues at the site and offers plenty of festive fun for visitors.

The streets of Expo City were bustling with more than 30 stalls and kiosks, offering an array of activities and festive products from carnival-style games to arts and crafts stations.

​The Evolution Scenic Team took on a unique and challenging project this Christmas season. The team spent hours creating a kiosk that was simple but elegant in appearance with a bright fairy lights effect, made a décor islands with a realistic snow that made it feel like Christmas.
Picture

HOSPITALITY SUITE @ F1 YAS ISLAND ABU DHABI

11/20/2022

 
Picture

The 2022 Abu Dhabi Grand Prix was a Formula One motor race that was held on 20 November 2022 at the Yas Marina Circuit in Abu Dhabi, United Arab Emirates.

Picture

EVOLUTION Provided a temporary Fit-out for VIP Guest for the event. This included designs and creative concept, Scenic and Technical production  and Event Management Services

PRADA MODE

11/9/2022

 
Picture
Picture
Italian luxury fashion house Prada presents its eighth iteration of Prada Mode, a traveling social club with a focus on contemporary culture that provides members with a unique art experience along with music, dining & conversations, featured a new edition of Pharmacy by Damien Hirst. Since the late 1980s, Hirst has created installations, sculptures, paintings, and drawings that explore the complex relationship between art, beauty, religion, science, life, and death.

The artist transformed a dedicated space at the landmark ICD Brookfield Place, the newest Landmark building in Dubai. During the two-days event, members participated to workshop, panels, and discussions as well as nightly events, sampling specially cocktails and dining throughout.
​​


​
​
Evolution scenic always loved to engage in a new concept to build and manage the flow of the event smoothly and safely. Our worldwide recognized client Kennedy London gave us the opportunity to build the artist concept to reality, turning a newest landmark building into a Dinning Bar event space from exhibition space.
​

Evolution have scanned the whole ceiling for rigging artist artwork and artificial track lights in the coordination with worldwide recognized client FARO Studio lighting designers under the supervision of worldwide recognized client VCA projects.​
​
​
Evolution scenic have built a massive functional custom bars in the middle of venue space and custom comfort furniture for the visitors to feel comfortable during the event. Medical display cabinet was core element as a life saver of the event based on the artist creation. Evolution scenic covered the venue glass windows with transparent vinyl printed sticker and covered 8m height circular column with special wallpaper. Our creative in-house Styro team turns a miniature DNA molecule into a core hanging elements to achieve visitors attention as a part of the event. 


Picture
Picture
Picture

adipec awards 2022

11/1/2022

 

ADIPEC Awards 2022 honour excellence across global energy industry. The 12th ADIPEC Awards, hosted by Abu Dhabi National Oil Company (ADNOC), has recognized outstanding individuals, projects and ideas that are transforming the global energy industry.

Picture
Evolution is proud to have worked with ADNOC and DMG Events to design and deliver the ADIPEC Awards 2022!
Picture
Evolution provided a turnkey solution for the event. This included design and creative concept development, scenic and technical production and Event Management Services. 

FOREVER vALENTINO, M7 DOHA QATAR.

10/28/2022

 
Forever - Valentino," Exhibition is a gorgeous garments theatrical presentation, the most comprehensive exhibition to date paying homage to the founder Valentino Garavani and they are opened Event at M7, the design and innovation hub in Msheireb Downtown Doha.
​
Evolution Live Events Management was hired by Valentinos teams to prepare a technical design and build the scenic display for Forever Valentino’s M7 Exhibition in Qatar, More then 15 Trucks of the material cross the borders to build there stuffs
Picture
Taking the reference of the actual colosseum, Evolution was tasked to build the design using materials that complimented the shape and curvature of the design without compromising the seamless finish of the feature and Its Built a very humongous distinctive style so we are using the expertise in materials such as metal, wooden frame and its covered with molten-nut fabric for the presentation of designer, Finally Evolution achieved the desired results.
Picture
Gasometer was the main challenging structure of this project because its fully made with steel tubes so Our evolution engineering deeply split the structure plan and change some fixing methodology and designing consisted preparing working Showcase Constructed a 6-ton technical structure that was meticulously thought out and had excellent workmanship for the showcasing of designer clothes at the Forever Valentino exhibition.
Picture
Picture
Utilizing the actual shelves as a model, it was necessary to construct the design using materials that enhanced the design's shape and curvature without diminishing the feature's seamless finish. Evolution accomplished the intended outcomes by using its knowledge in materials including wood, metal, and fabrics. For the Standardized presentation of designer labels in the Forever Valentino exhibition. 
A classic-style white wood table and Steel shelves with an elegant powder-coated finish was utilized for displaying apparel.
Picture
Scenic art 3D Mitoraj statues in fiber tissue material and its pleased on the MDF Scenic Art Plinth, The Status ceiling constructed in metal and Polycarbonate sheet because of its hanging from the truss, Inside of the lighting box have DC 24V Multicolor 3k to 6.2k LED Strips Strick on the twin base and it control color with remotely, In the printed backlit fabric material wrapped with hole structure, finally making it appear like a natural sky.
Picture
Picture
Picture
Signages was construct of multicolored acrylic panels, which make the ideal backdrop for the bespoke murals that can be found inside the exhibit spaces' walls. And with the aid of a steel wire rope, it is hanged from the truss.

LIST OF OTHER DISPLAY 
* CHASIER SHOWCASE PLINTH,
* GLASS DISPLAY TABLE,
* ARCHAVE SHOWCASE PLINTH,
* FABRIC WARRPED PIN BOAD,
* FABRIC WARRPED DISPLAY TABLE,
* SHOWCASE STEEL SHELVES,
* TV DISPLAYT STAND AND LIFT ROOM PLINTH
​

References Images:

Picture

KSA Riyadh Season - Buggy Boat

10/11/2022

 
Picture
​We were privileged to be a part of Riyadh Season opening this year which led us to work with one of the biggest Circus companies in the World, Cirque Du Soleil and Matane Productions. Our part was to deliver a boat that’s been converted from a Buggy.
All the control mechanism had to be rethought from scratch as the prop boat needed to act and feel like a boat. Steering wheel needed to be converted into a helm and the brake needed to be a part of the helm, which posed another challenge.
First we started with dismantling a brand new buggy carefully, while keeping all the electronics intact as we used it later. Once that was done, all that remained was the chassis with the motor and wheels. Another auxiliary chassis was designed from scratch and placed on top of it which acted as the base for the placements of all the plastic hollow sheets.
Once the auxiliary frame was bolted, it was time to place back all the other electronics. This is when we realized that the space we kept for the batteries were not enough and we forgot to make any additional space to keep all the electronics that drives the motor. After few hours of changing things here and there, we were able to fit everything in it. A motorcycle’s handle was used to act as an accelerator, which was placed at the tip of the helm. A 2 meter long metal wire was used to act as the conduit for the accelerator. Original accelerator was retrofitted to work with the handle. An extension arm was made and attached to the accelerator which pivoted from it’s place when the handle was twisted, resulting in acceleration. As for the brake, the brake wires were re-routed towards the helm too so pulling up the helm resulted in braking the buggy. Two lengthy wires were bolted near each front wheel, which in turn connected to the helm, twisting the helm sideways made the wheels turn. 
Picture
​Biggest issue that we faced was during it’s delivery to KSA, the boat ended up getting damaged from multiple places during transportation from Dubai to Riyadh. Battery tray broke down, which caused them to hang and the accelerator wire broke off from the pivot point. Luckily we had our Welder and Automation Engineer on site, and with their help we were able to fix up the boat.
Although there were multiple issues during the lifespan of this project, we had faith in our team to execute and delivery on time. With all the talented people at Evolution, we believe that we can do the impossible.
<<Previous

    Archives

    February 2023
    November 2022
    October 2022
    September 2022
    March 2022
    December 2021
    November 2021
    September 2021
    February 2021
    August 2020
    November 2019

    Categories

    All
    Exhibition Stands
    Festivals

    RSS Feed

Picture
SERVICES

​​Scenic
Technical
Rigging + Automation​
​Furniture
Prop Shop
Site Services
Design
Film + Digital
Comms
Events
COMPANY

Evolution Live Event Management LLC
Warehouse 22, Street 68
Jebel Ali Industrial Area 1
​Dubai, UAE
+971 4 8825338
hello@evolutionscenic.com
© COPYRIGHT 2023. ALL RIGHTS RESERVED.
  • Home
  • Scenic Services
    • CAD Design
    • Carpentry
    • Metalwork
    • 3D Production
    • Paint Shop
    • Textile Services
    • Print
  • Our Work
    • Terhal by Dragone
    • Prada Mode
    • Ideas Festival
    • ADIDAS Sole DXB
    • Forever Valentino
    • Warner Brother Theme Park
    • UAE 50th NAT DAY
    • Valorant
    • EXPO Opening
    • EXPO Closing
  • What Else We Do...
    • Evolution Site Services
    • Evolution Technical
    • Evolution Furniture
    • Evolution Prop Shop
    • Evolution Film + Digital
    • Evolution Comms
    • Evolution Events
    • Evolution Services